Nixa Schools – 5-6 Grade Building Nixa, Missouri
This project is a new single story school building. The building is approximately 70,000 SF in area. The primary structural system is load bearing CMU walls and conventional steel frame with steel braced frames for lateral resistance.
Students In Free Enterprise, Addition Phase II Springfield, Missouri
The project is a three-story office and conference center building with a connecting lobby to the existing three-story office building. It is approximately 32,600 SF and is a steel framed building.. The foundations system will be shallow spread footings.
Parkview High School Phase II Springfield, Missouri
This project consists of a renovation and addition to the existing Parkview High School. There is approximately 21,250 square feet in classroom additions, 25,775 square feet of kitchen, cafeteria, and media center additions and 19,300 square feet of renovation to existing space.
Additions to Existing Tipton School Tipton, Missouri
This project consists of additions to the existing school in Tipton, Missouri. The additions are approximately 25,730 square feet and 7,330 square feet. The large addition is mainly classrooms and constructed out of load-bearing CMU walls and steel flat roof.
Missouri Southern State University – Sports Facility West Plains, Missouri
This project was in two phases. Phase I consisted of an indoor practice facility: Football Field (200’x400’), Batting Cages (30’x200’) and Entrance Lobby (20’x40’). Phase II consisted of a two story structure with the weight training facility on the lower floor and the coach’s offices on the main floor.
University of Missouri, Columbia – Bradford Research Columbia, Missouri
This project is a FEMA building that consists of a single story classroom.
Woodson-Dear Upper Elementary Additions Richmond, Missouri
This project consists of a new 2-5 grade facility of approximately 69,600 square feet, a new addition to the Woodson-Dear building of approximately 10,770 square feet.
Stoutland School Stoutland, Missouri
This project consists of a separate bus barn and two phases for additions and alterations to the existing high school and elementary school in Stoutland Missouri.Phase I is a 7700 square foot addition next to the existing gymnasium. Phase II is a 3450 square foot addition with a common area between the existing schools and a 3250 square foot renovation to the existing superintendent and principals office area.
Follow Us on